Easterwood Sanitary Sewer Lines

Project No. 040626744

Legal Advertisement

Scope: Install 5,800 ft. of an 8 inch sanitary sewer line west of Easterwood Airport. Work includes a total of 740 ft. of 6 inch tie-ins of the existing sewer lines from Nuclear Science Center and Physics Observatory, decommission of an existing septic tank system, installation of a 5,645 ft. of 4 inch electrical conduit with 23 pull boxes, and 27 standard manholes.  A creek crossing with 20 pier supports is included for the 8 inch sewer line and a 6 inch domestic water line.  Questions regarding scope should be directed to Mr. Mikael Olsen at (979) 458-0417.

 

Subcontracting: All work will be awarded under a single prime contract. Texas A&M University has determined a HUB Subcontracting Plan (HSP) is required for this project. The following potential subcontracting opportunities are probable on this project: construction services; cement masons, concrete finishers, and terrazzo; construction equipment operators; dirt work/landscape contractor; hazardous materials removal; pipe and tubing fittings; roadwork – asphalt; other – builders supplies; other – fencing; and, other - markers, plaques, traffic control devices.  This list is not a comprehensive list of all subcontracting opportunities for this project.  The Bidder is responsible for identifying all types of potential subcontracting work. 

Bid Documents: For information regarding Specifications, Drawings, and issued Addenda, see the Contracting and Programming (CAP) website http://ppweb.tamu.edu/cap/projects.htm.  General contractors wishing to be listed as planholders on the CAP website for potential subcontractors, contact the CAP office at 979-862-1533.

Pre-bid Conference:  3:00 p.m., November 20, 2007, Physical Plant Administration Building, Room 204, College Station, Texas.

Bid Submittal:  Proposal and HUB Subcontracting Plan (HSP) must be received by the Contracting & Programming office in Room 213 of the Physical Plant Administration Building prior to 2:00 p.m., December 11, 2007. Public bid opening will follow.

Proposal/HSP  Deadline:  2:00 p.m., December 11, 2007

Project Estimate: $680,000

NOTE: Attached are the Specifications, Drawings, and any issued Addenda for this project.

          No paper copies will be available for this project.

 

Addendum No. 1

 

Front End

 

Specifications

 

Drawings

 

 

 Planholders

Company City, State Contact Person Phone Number Fax Number
Elliott Construction College Station, TX Curt Castenson 979-690-7071 979-690-7152
D & S Contracting College Station, TX DeAnne Smith 979-690-9232 979-690-9232
Brazos Valley Services Bryan, TX Ricky Palasota 979-255-9272 979-846-3159
Knife River Bryan, TX Kyle Lewis 979-361-2900 979-361-2920
Dudley Construction, Ltd. College Station, TX Alisyn Hargett 979-776-2135 979-776-2235
Kieschnick Construction College Station, TX Jerry Kieschnick 979-690-0710 979-690-5611

 

 

Bid Results
Bidders

Base Bid

Brazos Valley Services $725,000
*Dudley Construction, Ltd. $577,293
Elliott Construction, Ltd. $779,900
Knife River Corp. - South $696,200

*Contract awarded