Electrical Utility Improvements at the Brayton Fire Training Field

Project No. 070939969

 

Legal Advertisement

Scope:  Install underground 15 kV distribution system replacing aerial 15 kV distribution system serving the Brayton Fire Training Field.  Installation to include primary riser pole; manholes; concrete encased duct banks; 15 kV cables; owner-furnished vacuum sectionalizing switches; pad mounted transformers; and modifications to existing underground distribution system.  Install underground secondary distribution systems (480V/3-phase; 208V/3-phase) serving the various buildings and other facilities located throughout the Brayton Fire Training Field.  Installation to include direct buried duct bank; 600V secondary service conductors as well as feeder conductors; and service entrance panelboards and/or switches.  Demolish aerial 15 kV distribution system serving the Brayton Fire Training Field.  Demolish/modify secondary service equipment and associated distribution.  Questions regarding scope should be directed to Mr. Jesse Gonzalez at (210) 340-2322.

 

Subcontracting:  All work will be awarded under a single prime contract. Texas A&M University has determined a HUB Subcontracting Plan (HSP) is required for this project. The following potential subcontracting opportunities are probable on this project: construction services; carpenters; cement masons, concrete finishers and terrazzo; electricians – construction, power line and construction, utility underground projects; excavation services; painters; plumbers; surveyors; welders, structural steel; blue printing services.  This list is not a comprehensive list of all subcontracting opportunities for this project.  The Bidder is responsible for identifying all types of potential subcontracting work. 

Bid Documents:  For information regarding Specifications, Drawings, and issued Addenda, see the Contracting and Programming (CAP) website http://ppweb.tamu.edu/cap/projects.htm.  General contractors wishing to be listed as planholders on the CAP website for potential subcontractors, contact the CAP office at 979-862-1533.

Pre-bid Conference:  2:00 p.m., March 26, 2008, Physical Plant Administration Building, Room 204, College Station, Texas.

Bid Submittal: Proposal and HUB Subcontracting Plan (HSP) must be received by the Contracting & Programming office in Room 213 of the Physical Plant Administration Building prior to 2:00 p.m., April 15, 2008. Public bid opening will follow.

Proposal/HSP  Deadline:  2:00 p.m., April 15, 2008

Project Estimate: $1,000,000 - $1,300,000

NOTE: Attached are the Specifications, Drawings, and any issued Addenda for this project.

          No paper copies will be available for this project.

 

Addendum #3

 

Addendum #2

 

Addendum #1

 

Front End

 

Specifications

 

Drawings

 

 

 Planholders

Company City, State Contact Person Phone Number Fax Number
Bayer Construction Electrical Contractors, Inc. Bryan, TX

Jeff Zemanek

979-775-7752 979-823-0873

 

 

Bid Results
Bidders Base Bid Alt. 1 Alt. 2
Bayer Construction Electrical Contractors, Inc. $1,616,713

$10,000

$20,000
*College Station Construction $1,247,517 $104,382 $62,096
Britt Rice Electric, L.P. $1,357,769 $25,236 $22,887

  *Contract awarded